Sattva Aangane 3, 4 & 5 BHK High-Rises on a 10-Acre Site
3 to 5 BHK homes from ₹2.80 Cr* onwards, across 5 towers rising up to 42 floors on a ~10-acre site at Budigere Cross, Old Madras Road.
Sattva Aangane — Project Overview
Sattva Aangane is a new launch residential project by Sattva Group, planned across roughly 10 acres at Budigere Cross on the Old Madras Road corridor, East Bengaluru. The development comprises 5 towers rising from 9 to 42 floors, filed under K-RERA for 625 units across 3 BHK, 4 BHK, and a small number of 4 BHK and 5 BHK duplexes, with 3 BHK homes starting from ₹2.80 Cr* onwards.
Site work is reported to have begun around October 2026, with a RERA-filed completion date of October 2032. Sattva Aangane sits alongside Sattva Group's other active Budigere Cross addresses, Sattva Songbird and the newer Sattva Songbird Phase 2. Looking at the wider market before you decide? Browse every current Sattva Projects in Bangalore listing on our home page. A few listing portals quote a unit count of 997 against this project, while the RERA filing itself shows 625 — we've gone with the RERA-filed figure. Per-unit pricing above the 3 BHK entry figure is reported from public listings, not an official rate card — see the disclaimers in each section below.
Sattva Aangane — Starting ₹2.80 Cr*, New Launch
Register InterestSattva Aangane Configurations
3 to 5 BHK homes, from ₹2.80 Cr* onwards — no 2 BHK is offered at this project.
The project's entry configuration, available across most of the 5 towers.
Ask About ThisA larger family layout, the project's second-most-common configuration.
Ask About ThisA rare duplex format — only 8 units are filed across the project.
Ask About ThisThe project's largest and rarest format — only 2 units are filed.
Ask About ThisFloor plans shown above each card are representative layouts for that configuration from Sattva Group's broader portfolio, not the exact official floor plans for every unit of Sattva Aangane. Carpet areas above are from the K-RERA filing; per-unit pricing other than the sitewide 3 BHK starting figure is reported from public listings — request the latest, confirmed price list from our team before booking.
Sattva Aangane Amenities
A full clubhouse-and-sports amenity set, as filed with the K-RERA registration.
The RERA filing marks smart home automation and air conditioning as not applicable for this project — ask our team for the complete, current amenity brochure before relying on any item here.
Sattva Aangane Location & Connectivity
Bandapura Village, Old Madras Road (NH75), Budigere Cross, East Bengaluru.
What's Around Sattva Aangane
- Whitefield — reported ~12 km away
- ITPL — reported ~14 km away
- Kempegowda International Airport — reported ~18 km by road
- Nearest metro: KR Puram (Purple Line), reached by car
- Schools nearby: New Baldwin International, Jnana Gangotri International, The Polaris International
- Hospitals nearby: East Point Hospital, Ovum Hospital (Hoskote)
Whitefield & ITPL
Both reported within a 12–14 km commute, two of East Bangalore's largest IT employment hubs.
KR Puram Metro (Purple Line)
The nearest metro connection, reached by car rather than on foot from this address.
Schools Nearby
New Baldwin International, Jnana Gangotri International and The Polaris International are all reported in the area.
Hospitals Nearby
East Point Hospital and Ovum Hospital, Hoskote, are both reported within reach.
Kempegowda International Airport
Reported around 18 km away by road.
Same Corridor as Songbird
Sattva's other two active Budigere Cross addresses sit nearby.
Distances above are reported from public sources and are approximate — confirm with our team or verify independently before relying on them.
Sattva Aangane Specifications
Construction quality and in-home fit-out, reported from public sources and the K-RERA filing.
- Structure
- RCC framed, earthquake-resistant design, 5 towers (9 to 42 floors), 4 basements per tower
- Living & Bedroom Flooring
- Vitrified tiles
- Kitchen
- Granite platform, stainless steel sink, provision for RO & chimney, piped gas
- Bathroom Fittings
- Branded CP fittings & sanitaryware
- Electrical
- Concealed copper wiring, modular switches
- Lifts
- High-speed automatic lifts, reputed brand, per tower core
- Power Backup
- DG backup for lifts, pumps & common areas (filed as applicable)
- Water & Plumbing
- Rainwater harvesting, STP-treated water for flushing/landscaping
- Security
- CCTV at entry/exit & common areas, video intercom
- Fire Safety
- Fire sprinklers, hydrants & smoke detectors as per NBC norms
Specifications above reflect the K-RERA filing and the standard build quality a Sattva Group project of this scale typically carries — request the official, binding spec sheet from our team before relying on any item here.
Sattva Aangane Possession Timeline
RERA & BDA Filing
Registered under K-RERA No. PRM/KA/RERA/1251/446/PR/180926/008944, BDA-approved plan dated 02-02-2026.
Project Start
Reported to have started around 1 October 2026.
Construction Status
Early-stage, with site work underway, reported as "under construction."
RERA Completion Date
Filed as 21 October 2032. Some listing portals quote earlier dates (2029–2031), which the filing doesn't support.
Want the current price list and site photos?
Our team can share the latest tier-wise pricing, construction photos and RERA status for Sattva Aangane.
Sattva Aangane RERA Registration
Sattva Aangane is registered under Karnataka RERA (K-RERA) No. PRM/KA/RERA/1251/446/PR/180926/008944 (acknowledgement ACK/KA/RERA/1251/446/PR/090926/010582), promoted by Sattva Resi Private Limited, with a BDA-approved plan dated 02-02-2026 and a filed completion date of 21 October 2032.
The RERA filing shows a total project cost of ₹1,106.99 crore, with land cost of ₹413.07 crore and layout development cost of ₹693.92 crore. We found some discrepancies between this filing and third-party listing portals — notably on total unit count (625 per the filing vs. 997 on some portals) and the completion date (2032 per the filing vs. 2029–2031 on some portals). We've used the RERA filing's figures here as the more authoritative source.
Always verify the live RERA registration number and any amendments directly on the Karnataka RERA portal, and consult a property lawyer before committing to anything.
Sattva Aangane Developer — About Sattva Group
Sattva Group began operating out of Bengaluru in 1993 and is reported to have grown into one of South India's larger real estate developers, with a portfolio spanning residential, commercial, IT park and industrial developments across Bangalore, Hyderabad, Pune, Mumbai, Chennai, Coimbatore and Goa. Its commercial arm is behind large IT park developments such as Knowledge City in Hyderabad — an IGBC Platinum-rated, roughly 7 million sq ft campus — alongside Knowledge Park and Knowledge Capital. The group is a founding member of the Indian Green Building Council (IGBC) and holds ISO 9001, 14001 & 18001 certifications, with CRISIL and ICRA both reported to rate it ‘AA’ (Stable). Sattva Aangane is promoted through the group entity Sattva Resi Private Limited, and sits at Budigere Cross alongside the group's other active addresses, Sattva Songbird and Sattva Songbird Phase 2.
Developer figures are reported from public sources, vary between them, and may not reflect the latest official count — confirm directly with Sattva Group for the current portfolio.
Sattva Aangane — Buyer Considerations
What Stands Out
- K-RERA registered and BDA-approved, with site work already reported underway
- A genuinely large-format project — 5 towers up to 42 floors, 3 to 5 BHK homes
- A full clubhouse-and-sports amenity set, as filed with the RERA registration
- Within a 12–14 km commute of Whitefield and ITPL
- Backed by an established, 30+ year developer with other active addresses in the same micro-market
What to Check Before Booking
- Unit count and completion-date figures differ between the RERA filing and some listing portals — we've used the RERA figures, but verify independently
- Per-unit pricing above the 3 BHK entry figure is reported from public listings, not an official rate card
- RERA-filed completion is October 2032, several years out
- Smart home automation and air conditioning are filed as not applicable — don't assume these are included
- The nearest metro (KR Puram) is reached by car, not on foot
This is general information, not financial or legal advice. Do your own diligence, verify every figure directly with Sattva Group, the RERA portal and a property lawyer, and consult a professional before making a purchase decision.
Sattva Aangane — Frequently Asked Questions
Get the Sattva Aangane Price List & RERA Status
One enquiry gets you the current price list, construction photos and a RERA status check — no pressure, no spam.